Design, supply and installation of the power supply system and catenary for the tram of Bahía de Cádiz.
Efacec is the leader of the group responsible for performing the following activities in the Tram of Bahía de Cádiz, which will include 22 stops throughout 24 km:
• Installation of an overhead contact line (catenary);
• Installation of every equipment that will supply and distribute energy (feeders);
• Design and installation of 750Vdc traction substations.