Efacec

EDP Group – Renováveis - Tramandaí - Rio Grande do Sul/Brazil

  • Client EDP Group
  • Année 2010 - 2011
  • Pays Brasil

Tramandaí wind farm

  • Supply of a 34.5/69 KV substation, 80 MVA, as a turn-key job, including studies of the electrical system and connection with the CEEE utility.
    1 in-line Bay for Osório substation of CEEE.
    Telecommunication system between Osório substation and Tramandaí substation.

  • 1 line with 69 kV, 20 Km connecting the wind farms of Tramandaí with the Osório substation of CEEE.
    The line includes a simple circuit with a phase conductor.
    Towers are made of metal and concrete, in order to meet environmental requirements.